The Hurlingham Club
The Hurlingham Club
  • Home
  • Members' Area
  • Visitors
  • Membership
  • Private Events
  • The Club
  • History
  • The Estate
  • The Clubhouse
  • Facilities
  • News & Notices
  • Gallery
  • Press Office
  • Map & Directions
  • Contact Us
You are here: Home > Gallery > 2010 Gallery > Outdoor Pool Development - From August 2010
Gallery
  • 2012 Gallery
  • 2011 Gallery
  • 2010 Gallery
  • 2009 Gallery

Outdoor Pool Development - From August 2010

 
Old pool demolished and back-filled
Scroll left Scroll right
  • Laying the foundations for the worksite compound
  • Resurfacing tennis courts Q and R ready for the site compound
  • Installing the cabins in the site's compound
  • Pool break out and demolition of the changing rooms
  • First stages of the pool break out
  • Demolition of the changing rooms
  • Dam in place and the end of the lake drained
  • Bay trees felled
  • All of the buildings demolished
  • Changing rooms being demolished
  • Crushing concrete for re-use as lake infil and for piling mat
  • Main pool break out 17 Aug 1.jpg
  • Disposal of changing room wooden structure to large skip
  • Demolition finished 26 Aug
  • Old pool demolished and back-filled
  • Steel re-inforcement rods being unloaded
  • Laying the foundations for the new pool
  • Piling rig
  • Piling rig in operation
  • Concrete mixer for piling mat
  • Piling rig drilling
  • Markers in position to show end of reception
  • A variety of machinery constructing the new pool
  • Continuing to drill
  • Intricate construction work
  • Laying the foundations
  • The ongoing construction work
  • Workmen hard at work
  • Joiner at work
  • Working on the lake retaining wall
  • The lake retaining wall
  • Soakaway
  • Reinforcement in the piles
  • The lake wall
  • Concreting the lake wall first section
  • Continuing to concrete the lake wall second section
  • Happy at work
  • New sluice valve manhole
  • Reinforcement to lake wall
  • Shuttering to second section of the lake wall
  • The last concrete basement pile
  • Ground Beam being constructed
  • Completion of lake wall
  • Ground beam being constructed
  • Grading of site for excavation of basement and pools
  • Casting of ground beams
  • Concrete pour into shutters for ground beams
  • Conveyor on scaffolding for removal of spoil to barges
  • New lake end wall
  • Scaffold tower for conveyor to barges
  • Scaffold for conveyor to barges
  • Basement excavation
  • Concrete basement slab being laid
  • Continuing with the excavation of the basement
  • Pool water treatment filters arrive on site
  • Basement walls
  • Formwork frames being removed from basement walls
  • Formwork in place for basement walls
  • Formwork lifted out from basement walls
  • Services ducts in place
  • Copyright © The Hurlingham Club 2011
  • Corporate Social Responsibility
  • Legal
  • Site Map
  • Web Design - Moore-Wilson Web Design London
  • Print
  • Text Only
  • Text Size
  • Disable Large Text Version
  • Enable Large Text Version
  • Contrast
  • Disable High Contrast Version
  • Enable High Contrast Version
Copyright © The Hurlingham Club 2011